Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1908.6
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Jun 13, 2023     Avionics and Electrical - (2.6 hours)       Category: Avionics
Mocked up different examples of wire routing and discussed ideas with Ellicia. Thought through the process and decided I need to route most of the wires before terminating any and leave enough extra at each end of the wire so I can change routing before terminating wires if needed. Decided I need to label every non-shielded wire with the wire name and the pin number. Decided I need to label every shielded cable at each end (but not the individual wires in the shielded cable) with the wire name. I'll use printed heat shrink for labels and temporarily secure them with blue tape. I'll heat shrink the labels as I trim and terminate the wires. I may add pin number labels to all the individual wires in a shielded cable as I am terminating them.

Reviewed wiring section 11 of AC43.13-1B which covers wire routing, labels, bend radius, supports, service loops and other good information to help me use best practices.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.